Tag Archives
Made to measure
A 30-strong workforce of skilled costume makers have been temporarily relocated, while the Royal Shakespeare Company redevelops its workshops with the aid of …
Powering ahead
New steelwork construction and an extensive restoration programme are transforming Battersea Power Station into a huge multi-use destination, which will be the …
Showing off the past
Accommodating many of Doncaster’s historical relics, a new steel-framed cultural hub has also been designed to surround and exhibit a retained Edwardian …
School report
Steel construction was chosen for a new North West academy for speed of construction and its flexibility if structural alterations were required in the future. …
Steel completes on second of twin King’s Cross commercial developments
The main steel frame for the 12-storey S1 commercial block in London’s King’s Cross development has been completed. Requiring 2,400t of steel, the building …
Metal decking specialist becomes TV star
Composite Profiles, the specialist metal decking contractor, has starred in a TV programme that was broadcast on Executive TV. The 15-min programme featured …
Steelwork completes at Doncaster cultural centre
Containing 380t of structural steelwork, the frame for the Doncaster Cultural and Learning Centre has been completed by Hambleton Steel. The new steel-framed …
National Finalists – SSDA 2019
Project Mint at The O2 FACT FILE Architect: CallisonRTKL Structural engineer: BuroHappold Engineering Steelwork contractor: Bourne Steel Ltd Main contractor: …
Logistics in the frame
An East Midlands logistics park is currently completing its third phase, proving that steelwork has the right attributes to make it the ideal framing solution …
Fringe development
Located on the edge of the City of London, a 21-storey commercial building represents Phase 2 of a prestigious Aldgate redevelopment scheme. Nestled just …